Show on map
Lapeer - Lafayette 345 kV — Transmission lineUSNY - Markham Hollow Rd - 001 — Postponed · Solar · NY · 20 MW · 0.0 mi awayHomer Solar Energy Center — Filed · Solar · NY · 90 MW · 0.2 mi awayFabius CSG LLC — Under construction · Solar · NY · 5 MW · 0.6 mi awayTully 5 — Announced · Solar · NY · 2 MW · 1.7 mi awayTully 4 — Announced · Solar · NY · 5 MW · 1.7 mi awayCortland CSG 2 LLC — Under construction · Solar · NY · 5 MW · 7.5 mi awayScipio Solar — Under construction · Solar · NY · 18 MW · 12.1 mi awayCold Springs — Under construction · Solar · NY · 5 MW · 13.9 mi awayYellow Barn Solar — Announced · Solar · NY · 160 MW · 14.8 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Lapeer - Lafayette 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-NY
Owner (as stated)
Niagara Mohawk Power

Details

Who’s behind it

Owner
Niagara Mohawk Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
41
Substations at the ends (as the source names them)
Lapeer to Lafayette
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itniagara mohawk power
HIFLD line ID129205
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
USNY - Markham Hollow Rd - 001 Postponed Solar 0.0 mi 20
Homer Solar Energy Center Filed Solar 0.2 mi 90
Fabius CSG LLC Under construction Solar 0.6 mi 5
Tully 5 Announced Solar 1.7 mi 2
Tully 4 Announced Solar 1.7 mi 5
Cortland CSG 2 LLC Under construction Solar 7.5 mi 5
Scipio Solar Under construction Solar 12.1 mi 18
Cold Springs Under construction Solar 13.9 mi 5
Yellow Barn Solar Announced Solar 14.8 mi 160

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution