- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
Las Lomas Wind Project: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Las Lomas Wind Project
Power plant · Wind
Key facts
Power plant · Windran 33% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 582,906 MWh
- Grid
- 138 kV to AEP Texas Central Company (ERCO)
- Location
- Zapata County, Texas
- Operated by
- ENGIE North America
Operations
- Net generation, 2025
- 582,906
MWh - Fuel burned, 2025
- 1,988,877
MMBtu - Capacity factor, 2025
- 33.0
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 451,587 | 1,540,816 | — | — |
| 2025 | 582,906 | 1,988,877 | 33.0% | — |
| 2024 | 520,768 | 1,776,861 | 29.4% | — |
| 2023 | 579,160 | 1,976,093 | 32.8% | — |
| 2022 | 624,088 | 2,129,388 | 35.3% | — |
| 2021 | 548,967 | 4,855,063 | 31.1% | — |
| 2020 (1 of 12 months) | 5,249 | 46,018 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.
Sources
3 sourcesSources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)