Show on map
Las Vegas WPCF Solar Plant — Power plant · Solar · City of Las Vegas - (NV)JASMINE DEVELOPMENT, LLC — Built · Large load · NV · 6.7 mi awaySWITCH LTD. — Built · Large load · NV · 10.9 mi awaySwitch Data Center Building — Filed · Large load · NV · 11.1 mi awaySwitch NAP 16 — Under construction · Large load · NV · 11.6 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Las Vegas WPCF Solar Plant

Power plant · Solar

Key facts

Power plant · Solarran 17% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
4,811 MWh
Grid
12 kV to Nevada Power Co (NEVP)
Location
Clark County, Nevada
Operated by
City of Las Vegas - (NV)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
13 years since 2013
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816465
Location id
L100000813743
Eia plant ids
58477
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Nevada Power Co
Balancing authority code
NEVP
Balancing authority name
Nevada Power Company
Fuel burned (MMBtu), 202516,413
Capacity factor, 20250.166
Net generation (MWh), 20254,811
Balancing authority codeNEVP

Solar array

Array area (acres)
15.1
AC capacity (MW)
3.3
DC capacity (MW)
3.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2013

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
JASMINE DEVELOPMENT, LLC Built Large load 6.7 mi
SWITCH LTD. Built Large load 10.9 mi
Switch Data Center Building Filed Large load 11.1 mi
Switch NAP 16 Under construction Large load 11.6 mi

Sources EPA ICIS-Air · FAA OE/AAA

Sources

Attribution