Laurel
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engine Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1970
- Net generation, 2025
- 0 MWh
- Grid
- 2 kV to Cedar-Knox Public Power Dist (SWPP)
- Location
- Cedar County, Nebraska
- Operated by
- City of Laurel - (NE)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 56 years since 1970
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | SWPP |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Retirement
- Capacity retired
- 1.2 MW
- Generators retired
- 3
- Capacity still in service
- 3.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 6 | Natural Gas Internal Combustion Engine | 0.2 MW | Retired | February 2014 |
| 3 | Natural Gas Internal Combustion Engine | 0.6 MW | Retired | March 2016 |
| 4 | Natural Gas Internal Combustion Engine | 0.4 MW | Retired | April 2016 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 2 kV
- Transmission or distribution system owner
- Cedar-Knox Public Power Dist
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
Transmission lines within 25 km (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 4 scheduled to retire, 0.4 MW · EIA-860M
- Stated Unit 3 scheduled to retire, 0.6 MW · EIA-860M
- Stated Unit 6 scheduled to retire, 0.2 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory