Laurens
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2013
- Net generation, 2025
- 161 MWh
- Grid
- 12 kV to City of Laurens - (IA) (SWPP)
- Location
- Pocahontas County, Iowa
- Operated by
- City of Laurens - (IA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 13 years since 2013
- Heat rate
- 9,994 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 1,609 |
| Capacity factor, 2025 | 0.003 |
| Heat rate (Btu/kWh), 2025 | 9,993.8 |
| Net generation (MWh), 2025 | 161 |
| Balancing authority code | SWPP |
Retirement
- Capacity retired
- 1.6 MW
- Generators retired
- 2
- Capacity still in service
- 7.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 3 | Petroleum Liquids | 0.8 MW | Retired | October 2025 |
| 4 | Petroleum Liquids | 0.8 MW | Retired | October 2025 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 12 kV
- Transmission or distribution system owner
- City of Laurens - (IA)
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 3, 4 scheduled to retire, 1.6 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory