Laurinburg 230 kV line
- Wind & solar
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
- Other infrastructure
Laurinburg 230 kV line: route and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Laurinburg 230 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-NC
- Owner (as stated)
- Duke Energy Progress
Details
Who’s behind it
- Owner
- Duke Energy Progress
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 14
- Substations at the ends (as the source names them)
- Laurinburg
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | duke energy progress |
| HIFLD line ID | 138835 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Collard Holdings Solar Postponed | Solar | 0.0 mi | 10 |
| Scotch Grove Solar Filed | Solar | 6.2 mi | 80 |
| Island Grove Solar Postponed | Solar | 6.5 mi | 2 |
| Friesian Holdings Postponed | Solar | 6.6 mi | 75 |
| Hilly Branch Postponed | Solar | 7.8 mi | 2 |
| Rhubarb One Postponed | Solar | 8.3 mi | 5 |
| Gum Swamp Solar, LLC Under construction | Solar | 11.7 mi | 80 |
| Innovative Solar 53 Postponed | Solar | 12.3 mi | 40 |
| Pee Dee Solar II Postponed | Solar | 12.4 mi | 2 |
| Soy Solar Postponed | Solar | 13.2 mi | 5 |
| Clark Solar Postponed | Solar | 14.5 mi | 2 |
Sources EIA-860M