Show on map
Gum Swamp Solar, LLCLonghorn Holdings — Postponed · Solar · NC · 5 MW · 7.3 mi awayAMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS — Built · Large load · NC · 7.8 mi awayScotch Grove Solar — Filed · Solar · NC · 80 MW · 8.7 mi awayFriesian Holdings — Postponed · Solar · NC · 75 MW · 11.1 mi awayCollard Holdings Solar — Postponed · Solar · NC · 10 MW · 12.3 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Gum Swamp Solar, LLC

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Duke Energy Progress East (CPLE)
In-service date
(stated)
Location
Scotland County, North Carolina

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
70302 generator 22

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2027-05-01 → 2027-03-01.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Longhorn Holdings Postponed Solar 7.3 mi 5
AMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS Built Large load 7.8 mi
Scotch Grove Solar Filed Solar 8.7 mi 80
Friesian Holdings Postponed Solar 11.1 mi 75
Collard Holdings Solar Postponed Solar 12.3 mi 10

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution