Show on map
Leeds - Gilboa 345 kV — Transmission lineKCE NY 35, LLC — Postponed · Storage · NY · 200 MW · 0.4 mi awayPotic Solar — Filed · Solar · NY · 4.9 MW · 0.7 mi awayFlint Mine Solar — Permitted · Solar · NY · 100 MW · 1.6 mi awayMill Pond Hydro — Postponed · Hydro · NY · 0.5 MW · 2.2 mi awayEmerson NY — Announced · Solar · NY · 5 MW · 5.8 mi awayHecate Energy Gedney Hill — Postponed · Solar · NY · 20 MW · 7.3 mi awayBakers Falls Solar — Under construction · Solar · NY · 2.5 MW · 12.3 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Leeds - Gilboa 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-NY

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
37
Substations at the ends (as the source names them)
Leeds to Gilboa
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID136876
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
KCE NY 35, LLC Postponed Storage 0.4 mi 200
Potic Solar Filed Solar 0.7 mi 4.9
Flint Mine Solar Permitted Solar 1.6 mi 100
Mill Pond Hydro Postponed Hydro 2.2 mi 0.5
Emerson NY Announced Solar 5.8 mi 5
Hecate Energy Gedney Hill Postponed Solar 7.3 mi 20
Bakers Falls Solar Under construction Solar 12.3 mi 2.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution