Show on map
Lemoore West — Power plant · Solar · Leprino FoodsGrape — Under construction · Solar · CA · 246.4 MW · 11.6 mi awayCherry — Permitted · Solar + storage · CA · 359.7 MW · 13.5 mi awayHelen Solar 1 — Postponed · Solar · CA · 1.5 MW · 14.0 mi awayHelen Solar 2 — Postponed · Solar · CA · 1.5 MW · 14.1 mi away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Lemoore West

Power plant · Solar

Key facts

Power plant · Solarran 24% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
16,731 MWh
Grid
12 kV to Pacific Gas & Electric Co. (CISO)
Location
Kings County, California
Operated by
Leprino FoodsSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001048661
Location id
L100001043159
Eia plant ids
68027
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202557,087
Capacity factor, 20250.242
Net generation (MWh), 202516,731
Balancing authority codeCISO

Solar array

Array area (acres)
20.3
AC capacity (MW)
7.9
DC capacity (MW)
10
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Grape Under construction Solar 11.6 mi 246.4
Cherry Permitted Solar + storage 13.5 mi 359.7
Helen Solar 1 Postponed Solar 14.0 mi 1.5
Helen Solar 2 Postponed Solar 14.1 mi 1.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution