Lennon Generating

Power plant · Biomass

Key facts

Power plant · Biomassran 46% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
25,629 MWh
Grid
46 kV to Consumers Energy Co (MISO)
Location
Shiawassee County, Michigan
Operated by
North American Natural ResSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2025
Fuel burned MMBtu by year, 2014 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
14 years since 2012
Heat rate
12,145 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025311,253
Capacity factor, 20250.457
Heat rate (Btu/kWh), 202512,144.6
Net generation (MWh), 202525,629
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
3.2 MW
Generators retired
4
Capacity still in service
6.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Landfill Gas0.8 MWRetiredAugust 2017
4Landfill Gas0.8 MWRetiredAugust 2017
5Landfill Gas0.8 MWRetiredAugust 2017
6Landfill Gas0.8 MWRetiredAugust 2017

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
46 kV
Transmission or distribution system owner
Consumers Energy Co
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
Transmission lines within 15 mi (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 3, 4, 5, 6 scheduled to retire, 3.2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source