Leroy Center 345 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-OH
Owner (as stated)
American Transmission Systems Incorporated

Details

Who’s behind it

Owner
American Transmission Systems Incorporated

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
45
Substations at the ends (as the source names them)
Leroy Center
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itamerican transmission systems incorporated
HIFLD line ID156956
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
MCCo BESS Generating Facility Under construction Storage 5.5 mi 15.6
Icebreaker Offshore Wind Farm Postponed Offshore wind 12.8 mi 20.4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026