Show on map
Limerick Kv Sub - Peach Bottom 500 kV — Transmission lineYork Energy Center — Postponed · Gas, combined cycle · PA · 120 MW · 2.2 mi awayEssential Power Rock Springs LLC — Postponed · Gas, combustion turbine · MD · 390 MW · 6.8 mi awayFLEXENTIAL/ UPPER PROVIDENCE TWP — Built · Large load · PA · 7.2 mi awayTHE DATA CENTERS — Under construction · Large load · PA · 9.7 mi awayPioneer Crossing Energy, LLC — Postponed · Biomass · PA · 3.2 MW · 9.7 mi awayVALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE — Built · Large load · PA · 11.0 mi awayCrane Type - Manitowoc MLC-650 (Lancaster data centre) — Filed · Large load · PA · 12.5 mi awayCSL BEHRING DATA CTR/KING OF PRUSSIA — Built · Large load · PA · 12.6 mi away100a Swiss Dale Farm — Under construction · Solar · MD · 2 MW · 13.7 mi awayWest Point (PA) — Under construction · Gas, reciprocating engine · PA · 2.5 MW · 15.0 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Limerick Kv Sub - Peach Bottom 500 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-PA
Owner (as stated)
PECO Energy

Details

Who’s behind it

Owner
PECO Energy

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
57
Substations at the ends (as the source names them)
Limerick Kv Sub to Peach Bottom
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpeco energy
HIFLD line ID117214
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
York Energy Center Postponed Gas, combined cycle 2.2 mi 120
Essential Power Rock Springs LLC Postponed Gas, combustion turbine 6.8 mi 390
FLEXENTIAL/ UPPER PROVIDENCE TWP Built Large load 7.2 mi
THE DATA CENTERS Under construction Large load 9.7 mi
Pioneer Crossing Energy, LLC Postponed Biomass 9.7 mi 3.2
VALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE Built Large load 11.0 mi
Crane Type - Manitowoc MLC-650 (Lancaster data centre) Filed Large load 12.5 mi
CSL BEHRING DATA CTR/KING OF PRUSSIA Built Large load 12.6 mi
100a Swiss Dale Farm Under construction Solar 13.7 mi 2
West Point (PA) Under construction Gas, reciprocating engine 15.0 mi 2.5

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA

Sources

Attribution