Show on map
Limerick — Power plant · Nuclear · Constellation NuclearFLEXENTIAL/ UPPER PROVIDENCE TWP — Large load · PA · 12.2 km awayVALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE — Large load · PA · 18.3 km awayPioneer Crossing Energy, LLC — Biomass · PA · 3.2 MW · 20.3 km awayTHE DATA CENTERS — Large load · PA · 20.6 km awayCSL BEHRING DATA CTR/KING OF PRUSSIA — Large load · PA · 20.9 km awayWest Point (PA) — Gas, reciprocating engine · PA · 2.5 MW · 24.5 km away
  • Combustion
  • Clean firm
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Nuclear

Key facts

Power plant · Nuclearran 98% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2025
19,454,276 MWh
Grid
500 kV, 230 kV to PECO Energy Co (PJM)
Location
Montgomery County, Pennsylvania
Operated by
Constellation NuclearSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Nuclear

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Nuclear source: “Nuclear”
Age
40 years since 1986
Heat rate
10,443 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000500093, G100000500094
Location id
L100000500055
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
500, 230
Transmission owner
PECO Energy Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 2025203,168,524
Capacity factor, 20250.975
Heat rate (Btu/kWh), 202510,443.4
Net generation (MWh), 202519,454,276
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
FLEXENTIAL/ UPPER PROVIDENCE TWP Built Large load 12.2 km
VALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE Built Large load 18.3 km
Pioneer Crossing Energy, LLC Postponed Biomass 20.3 km 3.2
THE DATA CENTERS Under construction Large load 20.6 km
CSL BEHRING DATA CTR/KING OF PRUSSIA Built Large load 20.9 km
West Point (PA) Under construction Gas, reciprocating engine 24.5 km 2.5