Logansport
Power plant · Coal
Key facts
Power plant · Coalran 2% of 2016 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1958
- Net generation, 2016
- 12,321 MWh
- Location
- Cass County, Indiana
- Operated by
- City of Logansport - (IN)
Output
- Gas
- Coal
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Coal source: “Conventional Steam Coal”
- Age
- 68 years since 1958
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- January 2016
- Capacity retired
- 61 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 4 | Conventional Steam Coal | 18 MW | Retired | January 2016 |
| 5 | Conventional Steam Coal | 25 MW | Retired | January 2016 |
| 6 | Natural Gas Fired Combustion Turbine | 18 MW | Retired | January 2016 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Conventional Steam Coal | 43 MW | |
| Natural Gas Fired Combustion Turbine | 18 MW |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- MISO
Transmission lines within 15 mi (4)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| City of Logansport - (IN) | Operator | EIA-860M | ||
| LOGANSPORT MUNICIPAL UTILITIES | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units 4, 5, 6 scheduled to retire, 61 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Harvest Wind Energy Project Postponed | Wind | 11.4 mi |
Sources EIA-860M