Show on map
Lolita 138 kV line — Transmission lineThird Coast BESS, LLC — Contracted · Storage · TX · 102.8 MW · 0.1 mi awayStargate Point Comfort — Postponed · Gas, combustion turbine · TX · 250 MW · 2.7 mi awayGarcitas Creek Solar — Postponed · Solar · TX · 201.9 MW · 5.6 mi awayLunis Creek Solar and BESS SLF — Postponed · Solar + storage · TX · 1,238.5 MW · 11.3 mi awayDios BESS, LLC — Contracted · Storage · TX · 201.1 MW · 11.4 mi awayGoldenrod Creek Solar and BESS SLF — Postponed · Solar + storage · TX · 1,320 MW · 14.7 mi awayFlag City Solar — Postponed · Solar · TX · 167.3 MW · 14.8 mi away
  • Storage
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Lolita 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
AEP Texas

Details

Who’s behind it

Owner
AEP Texas

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
12
Substations at the ends (as the source names them)
Lolita
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itaep texas
HIFLD line ID312365
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Third Coast BESS, LLC Contracted Storage 0.1 mi 102.8
Stargate Point Comfort Postponed Gas, combustion turbine 2.7 mi 250
Garcitas Creek Solar Postponed Solar 5.6 mi 201.9
Lunis Creek Solar and BESS SLF Postponed Solar + storage 11.3 mi 1,238.5
Dios BESS, LLC Contracted Storage 11.4 mi 201.1
Goldenrod Creek Solar and BESS SLF Postponed Solar + storage 14.7 mi 1,320
Flag City Solar Postponed Solar 14.8 mi 167.3

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution