Lombard
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2004 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1969
- Net generation, 2004
- 1,610 MWh
- Location
- DuPage County, Illinois
- Operated by
- Midwest Generations EME LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 57 years since 1969
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2004
- Capacity retired
- 132.6 MW
- Generators retired
- 6
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 311 | Petroleum Liquids | 22.1 MW | Retired | December 2004 |
| 312 | Natural Gas Fired Combustion Turbine | 22.1 MW | Retired | December 2004 |
| 321 | Petroleum Liquids | 22.1 MW | Retired | December 2004 |
| 322 | Petroleum Liquids | 22.1 MW | Retired | December 2004 |
| 331 | Petroleum Liquids | 22.1 MW | Retired | December 2004 |
| 332 | Natural Gas Fired Combustion Turbine | 22.1 MW | Retired | December 2004 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Petroleum Liquids | 88.4 MW | |
| Natural Gas Fired Combustion Turbine | 44.2 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- NERC region
- RFC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 311, 312, 321, 322, 331, 332 scheduled to retire, 132.6 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Glendale Heights 10-SLCHI910 Under construction | Solar | 2.8 mi | 1.3 |
| Addison 11-SLCHI404 Under construction | Solar | 2.9 mi | 1.6 |
| CLOP CAROL STREAM IL LLC Built | Large load | 3.1 mi | |
| 360 TCS LLC Built | Large load | 4.1 mi | |
| ENSONO DATA CENTER Built | Large load | 4.7 mi | |
| CLEARBLUE TECHNOLOGIES/OAKBROOK INC Built | Large load | 6.9 mi | |
| NTT Data Centers Built | Large load | 7.3 mi | |
| Aligned (Northlake data centre) Built | Large load | 7.5 mi | |
| MICROSOFT CORP-CHICAGO DATA CENTER Built | Large load | 7.8 mi | |
| CHICAGO ENTERPRISE LLC Built | Large load | 7.8 mi | |
| Northlake 4-SLCHI304 Under construction | Solar | 7.8 mi | 1.4 |
| Cyrus One V3 Point 1 Under construction | Large load | 7.8 mi | |
| Bensenville 2-SLCHI526 Under construction | Solar | 7.9 mi | 1.9 |
| Northlake 5-SLCHI305 Under construction | Solar | 7.9 mi | 2.5 |
| NALCO WATER Built | Large load | 8.0 mi | |
| Northlake 2-SLCHI302 Under construction | Solar | 8.0 mi | 1.6 |
| Northlake 3-SLCHI303 Under construction | Solar | 8.1 mi | 1.6 |
| T5 Data Center Northlake Filed | Large load | 8.1 mi | |
| T5@CHICAGO III LP Built | Large load | 8.1 mi | |
| Copenhagen Ct Under construction | Solar | 8.1 mi | 3.5 |
| ELK GROVE DATA CENTER LLC Unknown | Large load | 8.5 mi | |
| Bensenville Ind Park 2-SLCHI402 Under construction | Solar | 8.5 mi | 1.1 |
| Bensenville Ind Park 4-SLCHI424 Under construction | Solar | 8.6 mi | 1.7 |
| COLOVORE LLC Built | Large load | 8.6 mi | |
| ORD-02 (West Chicago data centre) Filed | Large load | 8.6 mi | |
| DIPPER VENTURES LLC CH3 DATA CENTER Built | Large load | 8.7 mi | |
| Bensenville 14-SLCHI414 Under construction | Solar | 8.7 mi | 1.3 |
| Bensenville Ind Park 6-SLCHI406 Postponed | Solar | 8.8 mi | 1.1 |
| Bensenville 13-SLCHI513 Under construction | Solar | 8.8 mi | 1.4 |
| Mobile Crane - Unit (Chicago data centre) Filed | Large load | 8.8 mi | |
| 2425 BUSSE ROAD LLC Built | Large load | 8.8 mi | |
| Bensenville Ind Park 10-SLCHI410 Under construction | Solar | 8.8 mi | 1.2 |
| ELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER Built | Large load | 8.8 mi | |
| Bensenville Ind Park 12-SLCHI412 Postponed | Solar | 8.9 mi | 1.1 |
| Bensenville Ind Park 11 Under construction | Solar | 8.9 mi | 1.2 |
| Elk Grove 51-SLCHI151 Under construction | Solar | 9.3 mi | 1.4 |
| EQUINIX CH-5 DATA CENTER Built | Large load | 9.5 mi | |
| Equinix CH5 Chiller Built | Large load | 9.5 mi | |
| EDGECONNEX × 2 units Unknown | Large load | 9.6 mi | |
| STREAM DATA CENTERS Built | Large load | 9.6 mi | |
| Elk Grove 1-SLCHI701 Under construction | Solar | 9.9 mi | 1.7 |
| Data Center 901 Busse Road Elk Grove Filed | Large load | 10.0 mi | |
| STREAM DATA CENTERS ORDC CAMPUS Built | Large load | 10.0 mi | |
| T5@CHICAGO II LP Built | Large load | 10.2 mi | |
| ELK GROVE VILLAGE (CHI10-11-12) DATA CENTER Unknown | Large load | 10.4 mi | |
| CHI12 Data Center Filed | Large load | 10.4 mi | |
| 1454.07-IL 7 (Gevena data centre) Filed | Large load | 10.5 mi | |
| Prime Data Center Built | Large load | 10.5 mi | |
| DIGITAL GRAND AVENUE 3 LLC Built | Large load | 10.6 mi |
Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES