Long Point Solar: location and 10 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Long Point Solar
Power plant · Solar
Key facts
Power plant · Solar Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2025
- Grid
- 138 kV to CenterPoint Energy (ERCO)
- Location
- Brazoria County, Texas
- Operated by
- MN8 Energy LLC
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 1 year since 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 1,464 |
| Capacity factor, 2025 | 0.000 |
| Net generation (MWh), 2025 | 429 |
| Balancing authority code | ERCO |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| MN8 Energy LLC | Operator | EIA-860M | ||
| Long Point Solar, LLC | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Elio Energy LLC Contracted | Storage | 0.6 mi | 205.3 |
| Nash Solar Under construction | Solar | 4.9 mi | 10 |
| Second Division Solar Studied | Storage | 6.4 mi | 30 |
| Castor Under construction | Storage | 6.6 mi | 200 |
| Brazos River BESS LLC Contracted | Storage | 7.3 mi | 180.4 |
| Bell Creek BESS LLC Contracted | Storage | 7.4 mi | 200.9 |
| Rock Rose Energy Storage Under construction | Storage | 11.0 mi | 208.5 |
| Wittig Solar Park Permitted | Solar | 12.0 mi | 106.9 |
| Windmill Ridge Storage Postponed | Storage | 13.4 mi | 151.4 |
| Pledger Under construction | Storage | 14.8 mi | 9.5 |