Long Point Solar — Power plant · Solar · MN8 Energy LLCElio Energy LLC — Contracted · Storage · TX · 205.3 MW · 0.6 mi awayNash Solar — Under construction · Solar · TX · 10 MW · 4.9 mi awaySecond Division Solar — Studied · Storage · TX · 30 MW · 6.4 mi awayCastor — Under construction · Storage · TX · 200 MW · 6.6 mi awayBrazos River BESS LLC — Contracted · Storage · TX · 180.4 MW · 7.3 mi awayBell Creek BESS LLC — Contracted · Storage · TX · 200.9 MW · 7.4 mi awayRock Rose Energy Storage — Under construction · Storage · TX · 208.5 MW · 11.0 mi awayWittig Solar Park — Permitted · Solar · TX · 106.9 MW · 12.0 mi awayWindmill Ridge Storage — Postponed · Storage · TX · 151.4 MW · 13.4 mi awayPledger — Under construction · Storage · TX · 9.5 MW · 14.8 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Long Point Solar

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Brazoria County, Texas
Operated by
MN8 Energy LLC

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20251,464
Capacity factor, 20250.000
Net generation (MWh), 2025429
Balancing authority codeERCO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
MN8 Energy LLC Operator EIA-860M
Long Point Solar, LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Elio Energy LLC Contracted Storage 0.6 mi 205.3
Nash Solar Under construction Solar 4.9 mi 10
Second Division Solar Studied Storage 6.4 mi 30
Castor Under construction Storage 6.6 mi 200
Brazos River BESS LLC Contracted Storage 7.3 mi 180.4
Bell Creek BESS LLC Contracted Storage 7.4 mi 200.9
Rock Rose Energy Storage Under construction Storage 11.0 mi 208.5
Wittig Solar Park Permitted Solar 12.0 mi 106.9
Windmill Ridge Storage Postponed Storage 13.4 mi 151.4
Pledger Under construction Storage 14.8 mi 9.5

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026