Show on map
Lorenzo Wind — Power plant · Wind · Lorenzo Wind, LLCLorenzo Energy Storage — Announced · Storage · TX · 50 MW · 4.2 mi awayCrosby County Wind Farm, LLC — Postponed · Wind · TX · 150 MW · 5.3 mi awayCone Renewable Energy Project, LLC — Filed · Wind · TX · 150 MW · 12.9 mi away
  • Wind & solar
  • Storage
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Lorenzo Wind

Power plant · Wind

Key facts

Power plant · Windran 48% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
337,663 MWh
Grid
115 kV to Southwestern Public Service Co (SWPP)
Location
Crosby County, Texas
Operated by
Lorenzo Wind, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000909273
Location id
L100000906885
Eia plant ids
59244
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
115
Transmission owner
Southwestern Public Service Co
Balancing authority code
SWPP
Balancing authority name
Southwest Power Pool
Fuel burned (MMBtu), 20251,152,107
Capacity factor, 20250.482
Net generation (MWh), 2025337,663
Balancing authority codeSWPP

Wind turbines

Turbines
32
Turbine capacity (MW)
71.3
Turbine models
28 GE Wind GE2.3-116 and 4 GE Wind GE1.715-103
Hub height (m)
80
Rotor diameter (m)
103–116
Year online
2018

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Lorenzo Energy Storage Announced Storage 4.2 mi 50
Crosby County Wind Farm, LLC Postponed Wind 5.3 mi 150
Cone Renewable Energy Project, LLC Filed Wind 12.9 mi 150

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution