Show on map
Los Banos 230 kV line — Transmission lineStellar Wright BESS — Under construction · Storage · CA · 84.8 MW · 0.4 mi awayMerced BESS — Under construction · Storage · CA · 3 MW · 5.1 mi awayGonzaga Ridge Wind Farm — Under construction · Wind · CA · 34.6 MW · 6.0 mi awayGonzaga Ridge Wind Farm — Under construction · Wind · CA · 40.3 MW · 6.0 mi awayGonzaga Ridge Wind Farm — Under construction · Wind · CA · 57.9 MW · 6.0 mi awayGonzaga Ridge Battery Facility — Under construction · Storage · CA · 51.8 MW · 9.5 mi awayZeta Solar & Storage — Under construction · Solar + storage · CA · 75 MW · 11.0 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Los Banos 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
Substations at the ends (as the source names them)
Los Banos
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID310206
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Stellar Wright BESS Under construction Storage 0.4 mi 84.8
Merced BESS Under construction Storage 5.1 mi 3
Gonzaga Ridge Wind Farm × 3 units Under construction Wind 6.0 mi 132.8
Gonzaga Ridge Battery Facility Under construction Storage 9.5 mi 51.8
Zeta Solar & Storage Under construction Solar + storage 11.0 mi 75

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 15, 2026Source: California ISO

Attribution