Show on map
Lowland — Power plant · Coal · Lenzing Fibers Corp
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 54% of 2004 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1947
Net generation, 2004
96,597 MWh
Location
Hamblen County, Tennessee
Operated by
Lenzing Fibers CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2004
Fuel burned MMBtu by year, 2001 to 2004
  • Coal

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
79 years since 1947

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2005
Capacity retired
20.3 MW
Generators retired
5
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Conventional Steam Coal5 MWRetiredDecember 2005
GEN2Conventional Steam Coal5 MWRetiredDecember 2005
GEN3Conventional Steam Coal5 MWRetiredDecember 2005
GEN4Conventional Steam Coal0.3 MWRetiredDecember 2005
GEN5Conventional Steam Coal5 MWRetiredDecember 2005

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GEN1, GEN2, GEN3, GEN4, GEN5 scheduled to retire, 20.3 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source