Show on map
LUCKNOW - HIGHSPIRE TERMINAL, ALLENTOWN — Petroleum product terminalTIERPOINT PENNSYLVANIA TWO LLC — Built · Large load · PA · 4.3 mi awayPPL Glendon LFGTE Plant — Postponed · Biomass · PA · 1.6 MW · 10.8 mi awayTIERPOINT TWO, LLC - TEKPARK FACILITY — Built · Large load · PA · 13.5 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Lucknow - Highspire Terminal, Allentown

Petroleum product terminal

As filed: LUCKNOW - HIGHSPIRE TERMINAL, ALLENTOWN

Key facts

Petroleum product terminal Operating
Location
Pennsylvania

Details

Who’s behind it

Owner
Lucknow - Highspire TerminalSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd1
SiteALLENTOWN
SurveyEIA-815
Owner, as the source states itLUCKNOW - HIGHSPIRE TERMINAL
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
TIERPOINT PENNSYLVANIA TWO LLC Built Large load 4.3 mi
PPL Glendon LFGTE Plant Postponed Biomass 10.8 mi 1.6
TIERPOINT TWO, LLC - TEKPARK FACILITY Built Large load 13.5 mi

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution