Lucky Peak Power Plant Project
Power plant · Hydro
Key facts
Power plant · Hydroran 35% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1988
- Net generation, 2025
- 311,167 MWh
- Grid
- 138 kV to Idaho Power Co (IPCO)
- Location
- Ada County, Idaho
- Operated by
- Boise-Kuna Irrigation DistrictSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 311,167
MWh - Fuel burned, 2025
- 1,061,703
MMBtu - Capacity factor, 2025
- 35.1
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 311,167 | 1,061,703 | 35.1% | — |
| 2024 | 290,591 | 991,497 | 32.7% | — |
| 2023 | 331,848 | 1,132,264 | 37.4% | — |
| 2022 | 233,719 | 797,448 | 26.4% | — |
| 2021 | 221,668 | 1,960,431 | 25.0% | — |
| 2020 | 254,428 | 2,230,571 | 28.6% | — |
| 2019 | 363,871 | 3,240,272 | 41.0% | — |
| 2018 | 347,570 | 3,164,277 | 39.2% | — |
| 2017 | 463,317 | 4,268,541 | 52.3% | — |
| 2016 | 340,296 | 3,141,613 | 38.3% | — |
| 2015 | 277,864 | 2,589,414 | 31.3% | — |
| 2014 | 308,112 | 2,930,147 | 34.8% | — |
| 2013 | 215,468 | 2,055,779 | 24.3% | — |
| 2012 | 401,319 | 3,818,953 | 45.1% | — |
| 2011 | 388,780 | 3,777,386 | 43.9% | — |
| 2010 | 285,584 | 2,786,158 | 32.2% | — |
| 2009 | 321,789 | 3,140,659 | 36.3% | — |
| 2008 | 311,029 | 3,064,880 | 35.0% | — |
| 2007 | 272,599 | 2,694,366 | 30.8% | — |
| 2006 | 406,766 | 4,034,712 | 45.9% | — |
| 2005 | 226,238 | 2,262,154 | 25.5% | — |
| 2004 | 325,011 | 3,257,260 | 36.6% | — |
| 2003 | 292,398 | 2,994,448 | 33.0% | — |
| 2002 | 288,801 | 2,937,973 | 32.6% | — |
| 2001 | 188,377 | 1,946,500 | 21.2% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.
Sources
3 sourcesSources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)