Show on map
Ludie Brown Solar Energy Storage — Power plant · Storage · North Carolina El Member CorpCrimson Solar — Postponed · Solar · NC · 5 MW · 12.4 mi awayOnslow Energy — Postponed · Solar · NC · 1.5 MW · 13.1 mi awayWallace Solar 2 — Postponed · Solar · NC · 1.9 MW · 14.7 mi away
  • Storage
  • Operating
  • 10 · 100 · 1,000 MW

Ludie Brown Solar Energy Storage

Power plant · Storage

Key facts

Power plant · Storageran 8% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
3,243 MWh
Grid
12 kV to Four County Elec Member Corp (CPLE)
Location
Duplin County, North Carolina
Operated by
North Carolina El Member CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Storage source: “Batteries”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816569
Location id
L100000813840
Eia plant ids
64514
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Four County Elec Member Corp
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 202511,529
Capacity factor, 20250.082
Net generation (MWh), 20253,243
Balancing authority codeCPLE

Solar array

Array area (acres)
6.7
AC capacity (MW)
2
DC capacity (MW)
2.6
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Crimson Solar Postponed Solar 12.4 mi 5
Onslow Energy Postponed Solar 13.1 mi 1.5
Wallace Solar 2 Postponed Solar 14.7 mi 1.9

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution