Mabelvale — Power plant · Gas, combustion turbine · Entergy Arkansas LLCCity of Little Rock Solar Array — Solar · AR · 4.9 MW · 19.1 km away
  • Combustion
  • Wind & solar
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1970
Net generation, 2015
0 MWh
Grid
115 kV to Entergy Arkansas Inc (MISO)
Location
Pulaski County, Arkansas

Output

Net generation MWh by year, 2001 to 2016
Fuel burned MMBtu by year, 2001 to 2016
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
56 years since 1970
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110043785268
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000574
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2016
First unit retired
December 2013
Capacity retired
78 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Natural Gas Fired Combustion Turbine19.5 MWRetiredDecember 2013
4Natural Gas Fired Combustion Turbine19.5 MWRetiredDecember 2013
1Natural Gas Fired Combustion Turbine19.5 MWRetiredJune 2016
3Natural Gas Fired Combustion Turbine19.5 MWRetiredJune 2016

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Entergy Arkansas Inc
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 25 km (7)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Entergy Arkansas LLC Operator EIA-860M
Entergy Corp Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 1, 3 scheduled to retire, 39 MW · EIA-860M
  • Stated Units 2, 4 scheduled to retire, 39 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
City of Little Rock Solar Array Under construction Solar 19.1 km 4.9

Sources EIA-860M