Madison Dam — Power plant · Hydro · NorthWestern Energy (MT Hydro)
  • Clean firm
  • Operating
  • 10 · 100 · 1,000 MW

Madison Dam

Power plant · Hydro

Key facts

Power plant · Hydroran 53% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
75,588 MWh
Grid
100 kV to NorthWestern Energy LLC - (MT) (NWMT)
Location
Madison County, Montana
Operated by
NorthWestern Energy (MT Hydro)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
5 years since 2021
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025257,905
Capacity factor, 20250.526
Net generation (MWh), 202575,588
Balancing authority codeNWMT

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
8.8 MW
Generators retired
4
Capacity still in service
16.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
MAD1Conventional Hydroelectric2.2 MWRetiredOctober 2019
MAD2Conventional Hydroelectric2.2 MWRetiredOctober 2019
MAD3Conventional Hydroelectric2.2 MWRetiredOctober 2019
MAD4Conventional Hydroelectric2.2 MWRetiredOctober 2019

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
100 kV
Transmission or distribution system owner
NorthWestern Energy LLC - (MT)
Balancing authority
NorthWestern Energy (NWMT)
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • In service · EIA-860M
  • Stated Units MAD1, MAD2, MAD3, MAD4 scheduled to retire, 8.8 MW · EIA-860M