Show on map
MAGELLAN PIPELINE CO LP, CHARLOTTE 2 — Petroleum product terminalDLR Moores Chapel Mobile Crane (Charlotte data centre) — Filed · Large load · NC · 3.7 mi awayCLT16 - Data Center — Filed · Large load · NC · 7.1 mi awayCLT 16 12MW DATA CENTER — Under construction · Large load · NC · 7.1 mi awayAllen 2 BESS — Announced · Storage · NC · 167 MW · 7.3 mi awayMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 7.8 mi awayHornet Solar — Under construction · Solar · NC · 73 MW · 8.9 mi awayAREP DATA CENTER — Under construction · Large load · NC · 13.7 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Magellan Pipeline CO LP, Charlotte 2

Petroleum product terminal

As filed: MAGELLAN PIPELINE CO LP, CHARLOTTE 2

Key facts

Petroleum product terminal Operating
Location
North Carolina

Details

Who’s behind it

Owner
Magellan Pipeline CO LPSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd1
SiteCHARLOTTE 2
SurveyEIA-815
Owner, as the source states itMAGELLAN PIPELINE CO LP
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
DLR Moores Chapel Mobile Crane (Charlotte data centre) Filed Large load 3.7 mi
CLT16 - Data Center Filed Large load 7.1 mi
CLT 16 12MW DATA CENTER Under construction Large load 7.1 mi
Allen 2 BESS Announced Storage 7.3 mi 167
McDowell Creek Solar LLC Under construction Solar 7.8 mi 2
Hornet Solar Under construction Solar 8.9 mi 73
AREP DATA CENTER Under construction Large load 13.7 mi

Sources FAA OE/AAA · EPA ICIS-NPDES · EIA-860M

Sources

Attribution