Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Operating
- Other infrastructure
MAGELLAN PIPELINE CO LP, FROST: location and 9 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Magellan Pipeline CO LP, Frost
Petroleum product terminal
As filed: MAGELLAN PIPELINE CO LP, FROST
Key facts
Petroleum product terminal Operating- Location
- Texas
Details
Who’s behind it
- Owner
- Magellan Pipeline CO LPSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 3 |
| Site | FROST |
| Survey | EIA-815 |
| Owner, as the source states it | MAGELLAN PIPELINE CO LP |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Yellow Cat Wind, LLC Under construction | Wind | 3.5 mi | 262 |
| Oystercatcher Solar Built | Solar | 9.2 mi | 198.4 |
| Hill Solar II Under construction | Solar | 11.1 mi | 200 |
| OCI Hillsboro Announced | Solar + storage | 11.4 mi | 400 |
| Hill Solar 1 Under construction | Solar | 11.4 mi | 405 |
| Vial BESS Contracted | Storage | 12.6 mi | 135.2 |
| Edens Solar Studied | Solar | 13.0 mi | 70.8 |
| Ash Creek BESS Announced | Storage | 13.4 mi | 306 |
| Ion Solar (TX) Postponed | Solar | 13.7 mi | 384 |