Show on map
Magnolia 230 kV line — Transmission lineRoccasecca BESS LLC — Under construction · Storage · NV · 126.6 MW · 0.4 mi awayBoulder Flats Solar — Under construction · Solar · NV · 113 MW · 0.9 mi awayBoulder Solar III LLC — Announced · Solar + storage · NV · 256 MW · 2.2 mi awayJASMINE DEVELOPMENT, LLC — Built · Large load · NV · 6.8 mi awaySwitch Data Center Building — Filed · Large load · NV · 9.3 mi awaySWITCH LTD. — Built · Large load · NV · 9.3 mi awaySwitch NAP 16 — Under construction · Large load · NV · 9.9 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Magnolia 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NV
Owner (as stated)
Nevada Power dba NV Energy

Details

Who’s behind it

Owner
Nevada Power dba NV Energy

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
23
Substations at the ends (as the source names them)
Magnolia
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itnevada power dba nv energy
HIFLD line ID305036
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Roccasecca BESS LLC Under construction Storage 0.4 mi 126.6
Boulder Flats Solar Under construction Solar 0.9 mi 113
Boulder Solar III LLC Announced Solar + storage 2.2 mi 256
JASMINE DEVELOPMENT, LLC Built Large load 6.8 mi
Switch Data Center Building Filed Large load 9.3 mi
SWITCH LTD. Built Large load 9.3 mi
Switch NAP 16 Under construction Large load 9.9 mi

Sources CAISO · EIA-860M · EPA ICIS-Air · FAA OE/AAA

Sources

  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution