Show on map
Magnolia - Arden 230 kV — Transmission lineSwitch Data Center Building — Filed · Large load · NV · 3.4 mi awaySWITCH LTD. — Built · Large load · NV · 3.5 mi awaySwitch NAP 16 — Under construction · Large load · NV · 3.9 mi awayBoulder Flats Solar — Under construction · Solar · NV · 113 MW · 11.2 mi awayRoccasecca BESS LLC — Under construction · Storage · NV · 126.6 MW · 11.3 mi awayBoulder Solar III LLC — Announced · Solar + storage · NV · 256 MW · 13.3 mi awayJASMINE DEVELOPMENT, LLC — Built · Large load · NV · 13.8 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Magnolia - Arden 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NV
Owner (as stated)
Nevada Power dba NV Energy

Details

Who’s behind it

Owner
Nevada Power dba NV Energy

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
7
Substations at the ends (as the source names them)
Magnolia to Arden
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itnevada power dba nv energy
HIFLD line ID309857
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Switch Data Center Building Filed Large load 3.4 mi
SWITCH LTD. Built Large load 3.5 mi
Switch NAP 16 Under construction Large load 3.9 mi
Boulder Flats Solar Under construction Solar 11.2 mi 113
Roccasecca BESS LLC Under construction Storage 11.3 mi 126.6
Boulder Solar III LLC Announced Solar + storage 13.3 mi 256
JASMINE DEVELOPMENT, LLC Built Large load 13.8 mi

Sources FAA OE/AAA · EPA ICIS-Air · EIA-860M · CAISO

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 22, 2026Source: California ISO

Attribution