Show on map
Maize — Power plant · Solar · Today's Power, Inc.
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 26% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
2,321 MWh
Grid
14 kV, 0.5 kV to Sedgwick County El Coop Assn Inc (SWPP)
Location
Sedgwick County, Kansas
Operated by
Today's Power, Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001058456
Location id
L100001050709
Eia plant ids
68698
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
13.80, 0.500
Transmission owner
Sedgwick County El Coop Assn Inc
Balancing authority code
SWPP
Balancing authority name
Southwest Power Pool
Fuel burned (MMBtu), 20257,921
Capacity factor, 20250.265
Net generation (MWh), 20252,321
Balancing authority codeSWPP

Solar array

Array area (acres)
5.9
AC capacity (MW)
1
DC capacity (MW)
1.4
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source