Manchester Community College North — Power plant · Solar · Onyx Asset Services GroupHartford Hospital Cogeneration — Postponed · Gas, combustion turbine · CT · 11.5 MW · 5.7 mi awayNU - WETHERSFIELD DATA CENTER — Built · Large load · CT · 6.5 mi awayHomestead Fuel Cell — Postponed · Gas, other · CT · 8.4 MW · 7.3 mi awayEllington Solar One — Postponed · Solar · CT · 2 MW · 9.1 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 13.0 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 13.0 mi awayDollar Tree Solar One — Postponed · Solar · CT · 2 MW · 13.1 mi awayElevate Middletown — Announced · Storage · CT · 275 MW · 14.5 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Manchester Community College North

Power plant · Solar

Key facts

Power plant · Solarran 10% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
885 MWh
Grid
0.5 kV to NSTAR Electric Company (ISNE)
Location
Hartford County, Connecticut

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816605
Location id
L100000813874
Eia plant ids
62640
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
0.500
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 20253,019
Capacity factor, 20250.101
Net generation (MWh), 2025885
Balancing authority codeISNE

Solar arrays

Array area (acres)
4.2
AC capacity (MW)
1
DC capacity (MW)
1.4
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
CTGB Solar Mission III LLC Owner 100.0% Dec 31, 2025 EIA-860
Onyx Asset Services Group Operator EIA-860M

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hartford Hospital Cogeneration Postponed Gas, combustion turbine 5.7 mi 11.5
NU - WETHERSFIELD DATA CENTER Built Large load 6.5 mi
Homestead Fuel Cell Postponed Gas, other 7.3 mi 8.4
Ellington Solar One Postponed Solar 9.1 mi 2
CT Airport Authority Solar One Announced Solar 13.0 mi 4
Windsor Locks Under construction Solar 13.0 mi 1.8
Dollar Tree Solar One Postponed Solar 13.1 mi 2
Elevate Middletown Announced Storage 14.5 mi 275

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution