Show on map
Mansfield Station - Highland 345 kV — Transmission lineAligned Data Center Campus — Filed · Large load · PA · 0.1 mi awayMatador Solar — Postponed · Solar + storage · OH · 300 MW · 0.2 mi awayMontgomery L&D Hydroelectric Project — Announced · Hydro · PA · 20.4 MW · 1.7 mi awayMontgomery L&D Hydroelectric Project — Postponed · Hydro · PA · 9.5 MW · 1.7 mi awayMahoning — Postponed · Biomass · OH · 0.8 MW · 3.5 mi awayFirefly Solar PA — Filed · Solar · PA · 401.6 MW · 9.8 mi awayDashields Hydroelectric Project — Filed · Hydro · PA · 8.8 MW · 12.1 mi awayNew Cumberland Hydroelectric Project — Filed · Hydro · WV · 20 MW · 13.2 mi away
  • Clean firm
  • Wind & solar
  • Loads
  • In development
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Mansfield Station - Highland 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-OH, US-PA
Owner (as stated)
American Transmission Systems Incorporated

Details

Who’s behind it

Owner
American Transmission Systems Incorporated

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
52
Substations at the ends (as the source names them)
Mansfield Station to Highland
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itamerican transmission systems incorporated
HIFLD line ID134116
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Aligned Data Center Campus Filed Large load 0.1 mi
Matador Solar Postponed Solar + storage 0.2 mi 300
Montgomery L&D Hydroelectric Project × 2 units Announced Hydro 1.7 mi 29.9
Mahoning Postponed Biomass 3.5 mi 0.8
Firefly Solar PA Filed Solar 9.8 mi 401.6
Dashields Hydroelectric Project Filed Hydro 12.1 mi 8.8
New Cumberland Hydroelectric Project Filed Hydro 13.2 mi 20

Sources FAA OE/AAA · EIA-860M

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution