- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Maple Lake: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Maple Lake
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1978
- Net generation, 2025
- 321 MWh
- Grid
- 69 kV to Great River Energy (MISO)
- Location
- Wright County, Minnesota
- Operated by
- Great River EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 321
MWh - Fuel burned, 2025
- 5,952
MMBtu - Capacity factor, 2025
- 0.1
% - Heat rate, 2025
- 18,542
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 321 | 5,952 | 0.1% | 18,542 |
| 2024 | 176 | 2,726 | 0.1% | 15,489 |
| 2023 | 223 | 3,393 | 0.1% | 15,215 |
| 2022 | 699 | 10,454 | 0.3% | 14,956 |
| 2021 | 1,222 | 18,268 | 0.6% | 14,949 |
| 2020 | 350 | 5,296 | 0.2% | 15,131 |
| 2019 | 494 | 8,458 | 0.2% | 17,122 |
| 2018 | 380 | 5,928 | 0.2% | 15,600 |
| 2017 | 260 | 4,053 | 0.1% | 15,588 |
| 2016 | 288 | 4,576 | 0.1% | 15,889 |
| 2015 | 131 | 2,184 | 0.1% | 16,672 |
| 2014 | 452 | 7,125 | 0.2% | 15,763 |
| 2013 | 220 | 3,347 | 0.1% | 15,214 |
| 2012 | 330 | 6,349 | 0.1% | 19,239 |
| 2011 | 361 | 5,992 | 0.2% | 16,598 |
| 2010 | 191 | 3,056 | 0.1% | 16,000 |
| 2009 | 300 | 6,350 | 0.1% | 21,167 |
| 2008 | 201 | 2,998 | 0.1% | 14,915 |
| 2007 | 190 | 3,478 | 0.1% | 18,305 |
| 2006 | 289 | 5,419 | 0.1% | 18,751 |
| 2005 | 227 | 3,648 | 0.1% | 16,070 |
| 2004 | 0 | 0 | — | — |
| 2003 | 335 | 5,262 | 0.1% | 15,708 |
| 2002 | 482 | 7,381 | 0.2% | 15,313 |
| 2001 | 412 | 8,359 | 0.2% | 20,289 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.