Show on map
Marceline — Power plant · Oil · City of Marceline - (MO)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1989
Net generation, 2025
20 MWh
Grid
69 kV to City of Marceline - (MO) (MISO)
Location
Linn County, Missouri
Operated by
City of Marceline - (MO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
37 years since 1989
Heat rate
11,750 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
8
Units
4
Standby mw
8
Status rule
majority_mw_retiring
In service mw
8
Out of service mw
0
Fuel burned (MMBtu), 2025235
Capacity factor, 20250.000
Heat rate (Btu/kWh), 202511,750
Net generation (MWh), 202520
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Capacity retired
1.6 MW
Generators retired
2
Next scheduled retirement
December 2027
Capacity scheduled to retire
4 MW
Generators scheduled to retire
2
Share of in-service capacity scheduled
50%
Capacity still in service
8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Petroleum Liquids1.2 MWRetiredDecember 2006
4Petroleum Liquids0.4 MWRetiredDecember 2006
1Petroleum Liquids1 MWScheduled to retireDecember 2027
2Petroleum Liquids3 MWScheduled to retireDecember 2027

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
City of Marceline - (MO)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2 scheduled to retire, 4 MW · EIA-860M
  • Stated Units 3, 4 scheduled to retire, 1.6 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source