Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 35% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1963
Net generation, 2025
767,048 MWh
Grid
161 kV, 67 kV to Southern Illinois Elec Coop (MISO)
Location
Williamson County, Illinois
Operated by
Southern Illinois Power CoopSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Owner
Southern Illinois Power CoopSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of 31 Dec 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
63 years since 1963
Unused energy
1,414 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
16,030 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Clay Electric Co-operative Inc
Share pct
14.30
Gem entity id
E100002000196
Name
Clinton County Electric Cooperative Inc
Share pct
14.30
Gem entity id
E100002000190
Name
Egyptian Electric Cooperative Association
Share pct
14.30
Gem entity id
E100002000191
Name
Monroe County Electric Co-Operative Inc
Share pct
14.30
Gem entity id
E100002000192
Name
SouthEastern Illinois Electric Cooperative Inc
Share pct
14.30
Gem entity id
E100002000193
Name
Southern Illinois Electric Cooperative
Share pct
14.30
Gem entity id
E100002000194
Name
Tri-County Electric Cooperative Inc
Share pct
14.30
Gem entity id
E100002000195
Unit ids
G100000106663, G100000106664, G100000106665, G100000106666, G100000403513, G100000403514, G100001027877
Location id
L100000103868
Eia plant ids
5, 6, 976
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110017420049
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001530
Fuel burned (MMBtu), 202512,295,617
Capacity factor, 20250.352
Heat rate (Btu/kWh), 202516,029.8
Net generation (MWh), 2025767,048.0
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
173 MW
Generators retired
1
Capacity still in service
249 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
4Conventional Steam Coal173 MWRetiredNovember 2020

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
161 kV, 67 kV
Transmission or distribution system owner
Southern Illinois Elec Coop
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 4 scheduled to retire, 173 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Spillertown CSG 1 LLC Under construction Solar 16.0 km 5
Blue Branch Solar Under construction Solar 17.0 km 35.9
Spillertown CSG 2 LLC Under construction Solar 17.2 km 5
SV CSG Corbell Under construction Solar 17.9 km 2

Sources EIA-860M

Sources

Attribution