Show on map
Mars Solar — Power plant · Solar · Sol SystemsTorrecillas Energy Storage — Storage · TX · 9.9 MW · 22.0 km away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 23% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
20,374 MWh
Grid
12 kV to AEP Texas Central Company (ERCO)
Location
Webb County, Texas
Operated by
Sol SystemsSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
7 years since 2019
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816633
Location id
L100000813897
Eia plant ids
63027
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
AEP Texas Central Company
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 202569,516
Capacity factor, 20250.233
Net generation (MWh), 202520,374
Balancing authority codeERCO

Solar array

Array area (acres)
69.2
AC capacity (MW)
10
DC capacity (MW)
14.2
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2019

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Torrecillas Energy Storage Under construction Storage 22.0 km 9.9

Sources EIA-860M

Sources

Attribution