Show on map
Marshall (MO) — Power plant · Gas, combustion turbine · City of Marshall - (MO)Marshall Energy Center — Gas, combustion turbine · MO · 122.2 MW · 0.1 km away
  • Combustion
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Marshall (MO)

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1972
Net generation, 2025
1,286 MWh
Grid
161 kV to Evergy Metro (SWPP)
Location
Saline County, Missouri

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Coal
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
54 years since 1972
Unused energy
269 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
12,858 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110001451777
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1002126
Fuel burned (MMBtu), 202516,535
Capacity factor, 20250.005
Heat rate (Btu/kWh), 202512,857.7
Net generation (MWh), 20251,286
Balancing authority codeSWPP

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
26.5 MW
Generators retired
3
Capacity still in service
30.8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Natural Gas Steam Turbine4 MWRetiredJuly 2014
4Conventional Steam Coal6 MWRetiredJuly 2016
5Conventional Steam Coal16.5 MWRetiredDecember 2016
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal22.5 MW
Natural Gas Steam Turbine4 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
161 kV
Transmission or distribution system owner
Evergy Metro
Balancing authority
Southwest Power Pool
NERC region
SERC
Transmission lines within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Marshall - (MO) Operator EIA-860M
MARSHALL MUNICIPAL UTILITIES Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit 5 scheduled to retire, 16.5 MW · EIA-860M
  • Stated Unit 4 scheduled to retire, 6 MW · EIA-860M
  • Stated Unit 3 scheduled to retire, 4 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Marshall Energy Center Under construction Gas, combustion turbine 0.1 km 122.2

Sources EIA-860M

Sources

Attribution