Show on map
Marshall Steam Station 230 kV line — Transmission lineBaxter Creek Solar — Under construction · Solar · NC · 30 MW · 2.1 mi awayBaxter Creek Solar — Under construction · Solar · NC · 30 MW · 2.1 mi awayDuroc Holdings — Postponed · Solar · NC · 5 MW · 2.7 mi awayBear Poplar Solar — Postponed · Solar · NC · 5 MW · 5.9 mi awayAustin Solar — Postponed · Solar · NC · 2 MW · 9.0 mi awayMaiden Creek Battery — Under construction · Storage · NC · 50 MW · 12.0 mi awayOlin Creek Farm Solar — Postponed · Solar · NC · 35 MW · 12.1 mi awayDill Holdings LLC — Under construction · Solar · NC · 10 MW · 12.6 mi awayRJ Solar — Postponed · Solar · NC · 5 MW · 13.5 mi awayRowan Solar NC LLC — Postponed · Solar · NC · 2 MW · 13.7 mi awayMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 14.0 mi awayMICROSOFT CORPORATION, CLT10 — Built · Large load · NC · 14.5 mi awayHornet Solar — Under construction · Solar · NC · 73 MW · 14.8 mi away
  • Wind & solar
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Marshall Steam Station 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
52
Substations at the ends (as the source names them)
Marshall Steam Station
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID110487
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Baxter Creek Solar × 2 units Under construction Solar 2.1 mi 60
Duroc Holdings Postponed Solar 2.7 mi 5
Bear Poplar Solar Postponed Solar 5.9 mi 5
Austin Solar Postponed Solar 9.0 mi 2
Maiden Creek Battery Under construction Storage 12.0 mi 50
Olin Creek Farm Solar Postponed Solar 12.1 mi 35
Dill Holdings LLC Under construction Solar 12.6 mi 10
RJ Solar Postponed Solar 13.5 mi 5
Rowan Solar NC LLC Postponed Solar 13.7 mi 2
McDowell Creek Solar LLC Under construction Solar 14.0 mi 2
MICROSOFT CORPORATION, CLT10 Built Large load 14.5 mi
Hornet Solar Under construction Solar 14.8 mi 73

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution