Show on map
Marshall Steam Station - Mcguire 230 kV — Transmission lineMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 1.9 mi awayHornet Solar — Under construction · Solar · NC · 73 MW · 4.6 mi awayAustin Solar — Postponed · Solar · NC · 2 MW · 8.6 mi awayMaiden Creek Battery — Under construction · Battery storage · NC · 50 MW · 11.5 mi awayDLR Moores Chapel Mobile Crane (Charlotte data centre) — Filed · Large load · NC · 11.9 mi awayMICROSOFT CORPORATION, CLT10 — Built · Large load · NC · 13.4 mi awayRJ Solar — Postponed · Solar · NC · 5 MW · 14.1 mi awayClark Creek Solar Plant — Filed · Solar + storage · NC · 54 MW · 14.3 mi awayAPPLE INC. — Built · Large load · NC · 14.9 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Marshall Steam Station - Mcguire 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
14
Substations at the ends (as the source names them)
Marshall Steam Station to Mcguire
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID100664
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
McDowell Creek Solar LLC Under construction Solar 1.9 mi 2
Hornet Solar Under construction Solar 4.6 mi 73
Austin Solar Postponed Solar 8.6 mi 2
Maiden Creek Battery Under construction Battery storage 11.5 mi 50
DLR Moores Chapel Mobile Crane (Charlotte data centre) Filed Large load 11.9 mi
MICROSOFT CORPORATION, CLT10 Built Large load 13.4 mi
RJ Solar Postponed Solar 14.1 mi 5
Clark Creek Solar Plant Filed Solar + storage 14.3 mi 54
APPLE INC. Built Large load 14.9 mi

Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air

Sources

Attribution