Show on map
Clark Creek Solar PlantMICROSOFT CORPORATION, CLT10 — Built · Large load · NC · 3.9 mi awayAPPLE INC. — Built · Large load · NC · 4.0 mi awayMaiden Creek Battery — Under construction · Storage · NC · 50 MW · 6.6 mi awayMICROSOFT CORPORATION, CLT17 — Built · Large load · NC · 7.2 mi awayAustin Solar — Postponed · Solar · NC · 2 MW · 8.6 mi awayTower Solar Center LLC — Postponed · Solar · NC · 5 MW · 10.2 mi awayCLT40 DATA CENTER — Under construction · Large load · NC · 12.9 mi awayCLT04 LYLE CREEK DATA CENTER — Under construction · Large load · NC · 14.2 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Clark Creek Solar Plant

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Duke Energy Progress West (CPLW)
In-service date
(stated)
Location
Lincoln County, North Carolina

Details

Who’s behind it

Developer
Duke Energy Carolinas, LLC · part of Duke EnergyOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Solar Photovoltaic + Batteries”
Capacity (MW)
54 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
69771 2 generatorsEIA generatorsPlant 69771 CCBS1, CCSP1

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as filed in EIA-860M (source status: “(L) Regulatory approvals pending. Not under construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
MICROSOFT CORPORATION, CLT10 Built Large load 3.9 mi
APPLE INC. Built Large load 4.0 mi
Maiden Creek Battery Under construction Storage 6.6 mi 50
MICROSOFT CORPORATION, CLT17 Built Large load 7.2 mi
Austin Solar Postponed Solar 8.6 mi 2
Tower Solar Center LLC Postponed Solar 10.2 mi 5
CLT40 DATA CENTER Under construction Large load 12.9 mi
CLT04 LYLE CREEK DATA CENTER Under construction Large load 14.2 mi

Sources EPA ICIS-Air · EIA-860M · EPA ICIS-NPDES

Sources

Attribution