Show on map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Stage not stated
- Size not stated
- Other infrastructure
Martin - San Mateo 230 kV: route and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Martin - San Mateo 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-CA
- Owner (as stated)
- Pacific Gas Electric
Details
Who’s behind it
- Owner
- Pacific Gas Electric
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 12
- Substations at the ends (as the source names them)
- Martin to San Mateo
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | pacific gas electric |
| HIFLD line ID | 309106 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| San Francisco Intl Airport Ct Project Postponed | Gas, combustion turbine | 1.2 mi | 48 |
| San Francisco Electric Reliability Proj Withdrawn | Gas, combustion turbine | 5.8 mi | 151.5 |
| Ameresco Ox Mountain Filed | Biomass | 6.5 mi | 3 |
| Dynegy Oakland Power Plant Announced | Storage | 9.5 mi | 43.3 |
| HAYWARD DATA CENTER Unknown | Large load | 11.6 mi | |
| San Leandro 10 - sleba702 Under construction | Solar | 11.7 mi | 1 |
| Gateway#1&2 (Newark CA) Announced | Solar | 14.4 mi | 1.1 |
Sources EIA-860M · CAISO · EPA ICIS-NPDES