McKee Run — Power plant · Gas, steam turbine · NAES Corporation - (DE)Sunrise Magnolia DE — Under construction · Solar · DE · 3 MW · 12.5 km awayCedar Creek Solar — Filed · Solar · DE · 114 MW · 21.9 km away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1962
Net generation, 2021
0 MWh
Grid
230 kV to City of Dover - (DE) (PJM)
Location
Kent County, Delaware

Output

Net generation MWh by year, 2001 to 2021
Fuel burned MMBtu by year, 2001 to 2021
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
64 years since 1962
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002506841
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001480
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
May 2021
First unit retired
May 2017
Capacity retired
151.2 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine18.8 MWRetiredMay 2017
2Natural Gas Steam Turbine18.8 MWRetiredMay 2017
3Natural Gas Steam Turbine113.6 MWRetiredMay 2021

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
City of Dover - (DE)
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 25 km (7)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
NAES Corporation - (DE) Operator EIA-860M
CITY OF DOVER Owner 100.0% Dec 31, 2023 EPA GHGRP
City of Dover - (DE) Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Unit 3 scheduled to retire, 113.6 MW · EIA-860M
  • Stated Units 1, 2 scheduled to retire, 37.6 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Sunrise Magnolia DE Under construction Solar 12.5 km 3
Cedar Creek Solar Filed Solar 21.9 km 114

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026