Show on map
McKittrick Cogen — Power plant · Gas, combustion turbine · Chevron U.S.A., Inc.Hydrogen Energy California LLC — Withdrawn · Coal · CA · 421 MW · 12.3 mi away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

McKittrick Cogen

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 58% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
61,230 MWh
Grid
115 kV to Pacific Gas & Electric Co (CISO)
Location
Kern County, California

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Owner
Chevron

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
14 years since 2012
Unused energy
44 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
13,021 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110064125744
NAICS code
211111
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007955
Fuel burned (MMBtu), 2025797,288
Capacity factor, 20250.583
Heat rate (Btu/kWh), 202513,021.2
Net generation (MWh), 202561,230
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
9.6 MW
Generators retired
3
Capacity still in service
12 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Fired Combustion Turbine3.2 MWRetiredJune 2012
GEN2Natural Gas Fired Combustion Turbine3.2 MWRetiredJune 2012
GEN3Natural Gas Fired Combustion Turbine3.2 MWRetiredJune 2012

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Pacific Gas & Electric Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Chevron U.S.A., Inc. Operator EIA-860M
Chevron Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units GEN1, GEN2, GEN3 scheduled to retire, 9.6 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hydrogen Energy California LLC Withdrawn Coal 12.3 mi 421

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution