Show on map
Mclean Wind Farm Stepup Transformer 138 kV line — Transmission lineWashington Street Solar 1 LLC — Under construction · Solar · IL · 5 MW · 1.8 mi awaySV CSG Bloomington — Permitted · Solar + storage · IL · 10 MW · 2.6 mi awayKieser — Under construction · Solar · IL · 5 MW · 4.7 mi awayCottonwood - IL — Under construction · Solar · IL · 4.9 MW · 6.9 mi awayEl Paso Wind Project — Postponed · Wind · IL · 80 MW · 9.1 mi awayPanther Grove Wind, LLC — Under construction · Wind · IL · 423 MW · 10.6 mi awayFast Ave Solar LLC — Under construction · Solar · IL · 5 MW · 12.8 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Mclean Wind Farm Stepup Transformer 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-IL
Owner (as stated)
Ameren Illinois

Details

Who’s behind it

Owner
Ameren Illinois

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
6
Substations at the ends (as the source names them)
Mclean Wind Farm Stepup Transformer
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itameren illinois
HIFLD line ID116859
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Washington Street Solar 1 LLC Under construction Solar 1.8 mi 5
SV CSG Bloomington Permitted Solar + storage 2.6 mi 10
Kieser Under construction Solar 4.7 mi 5
Cottonwood - IL Under construction Solar 6.9 mi 4.9
El Paso Wind Project Postponed Wind 9.1 mi 80
Panther Grove Wind, LLC Under construction Wind 10.6 mi 423
Fast Ave Solar LLC Under construction Solar 12.8 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution