Show on map
McLeansboro — Power plant · Oil · City of McLeansboro - (IL)Meadow Springs Renewable Energy (Hybrid) — Announced · Solar + storage · IL · 300 MW · 14.7 mi away
  • Combustion
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

McLeansboro

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1950
Net generation, 2025
42 MWh
Grid
69 kV to City of McLeansboro - (IL) (MISO)
Location
Hamilton County, Illinois
Operated by
City of McLeansboro - (IL)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
76 years since 1950
Heat rate
11,310 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
OS
Mw
0.600
Units
1
SB
Mw
5.50
Units
3
Standby mw
5.50
Status rule
majority_mw_standby
In service mw
6.10
Out of service mw
0.600
Fuel burned (MMBtu), 2025475
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202511,309.5
Net generation (MWh), 202542
Balancing authority codeMISO

Retirement

Capacity retired
3.1 MW
Generators retired
2
Capacity still in service
6.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
8Petroleum Liquids1.1 MWRetiredJanuary 2020
9Petroleum Liquids2 MWRetiredJanuary 2020

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
City of McLeansboro - (IL)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Transmission lines within 15 mi (5)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 8, 9 scheduled to retire, 3.1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Meadow Springs Renewable Energy (Hybrid) Announced Solar + storage 14.7 mi 300

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution