Show on map
McMullen — Gas processing plant · Houston Pipeline CoReis Solar Park — Solar · TX · 105.5 MW · 23.2 km away
  • Wind & solar
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Gas processing plant

Key facts

Gas processing plant Operating
Location
McMullen County, Texas
Operated by
Houston Pipeline CoSourceEIA US Energy Atlas — Natural Gas Processing Plants (point geometries, operator, capacity)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity (MMcf/d)
5

Capacity not stated

All 10 attributes from EIA US Energy Atlas — Natural Gas Processing Plants (point geometries, operator, capacity)
Attributes
AttributeValue
CityTilden
Source period2017
Dry gas storage capacity0
NGL storage capacity760
ZIP code78072
Heat content (Btu per cubic foot)1,260
Operator, as the source states itHouston Pipeline Co.
Capacity (MMcf/d)5
Source release2017_v2
Plant flow (MMcf/d)4

Around this asset

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Reis Solar Park Permitted Solar 23.2 km 105.5

Sources ERCOT · EIA-860M

Sources

Attribution