- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
Meadow Lake Wind Farm V LLC: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Meadow Lake Wind Farm V LLC
Power plant · Wind
Key facts
Power plant · Windran 38% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2017
- Net generation, 2025
- 331,188 MWh
- Grid
- 345 kV to Indiana Michigan Power Co (PJM)
- Location
- White County, Indiana
- Operated by
- Meadow Lake Wind Farm V LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 331,188
MWh - Fuel burned, 2025
- 1,130,013
MMBtu - Capacity factor, 2025
- 37.8
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 234,612 | 800,496 | — | — |
| 2025 | 331,188 | 1,130,013 | 37.8% | — |
| 2024 | 337,015 | 1,149,894 | 38.4% | — |
| 2023 | 311,947 | 1,064,363 | 35.6% | — |
| 2022 | 349,662 | 1,193,047 | 39.9% | — |
| 2021 | 324,254 | 2,867,702 | 37.0% | — |
| 2020 | 327,008 | 2,866,880 | 37.2% | — |
| 2019 | 344,064 | 3,063,891 | 39.3% | — |
| 2018 | 322,909 | 2,939,765 | 36.9% | — |
| 2017 (6 of 12 months) | 134,859 | 1,242,457 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.