Show on map
Meadow Lake Wind Farm VI LLC — Power plant · Wind · Meadow Lake Wind Farm VI LLCTempleton Wind — Permitted · Wind · IN · 200.2 MW · 12.0 mi awayPurdue Energy Park — Postponed · Wind · IN · 39.2 MW · 13.2 mi awayHoosier Line Solar — Announced · Solar · IN · 180 MW · 14.5 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Meadow Lake Wind Farm VI LLC

Power plant · Wind

Key facts

Power plant · Windran 37% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
641,795 MWh
Grid
345 kV to Indiana Michigan Power Co (MISO)
Location
Benton County, Indiana
Operated by
Meadow Lake Wind Farm VI LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Wind source: “Onshore Wind Turbine”
Age
8 years since 2018
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
345
Transmission owner
Indiana Michigan Power Co
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 20252,189,804
Capacity factor, 20250.366
Net generation (MWh), 2025641,795
Balancing authority codeMISO

Wind turbines

Turbines
61
Turbine capacity (MW)
200.4
Turbine models
12 Vestas V110-2.0 and 49 Vestas V136-3.6
Hub height (m)
95–105
Rotor diameter (m)
110–136
Year online
2018

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Templeton Wind Permitted Wind 12.0 mi 200.2
Purdue Energy Park Postponed Wind 13.2 mi 39.2
Hoosier Line Solar Announced Solar 14.5 mi 180

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution