Memphis — Power plant · Oil · City of Memphis - (MO)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2022 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1945
Net generation, 2022
8 MWh
Grid
69 kV to City of Memphis - (MO) (AECI)
Location
Scotland County, Missouri
Operated by
City of Memphis - (MO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2022
8MWh
Fuel burned, 2022
92MMBtu
Capacity factor, 2022
0.0%
Heat rate, 2022
11,500Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20228920.0%11,500
201900——
201800——
201700——
20163410.0%13,667
20151240.0%24,000
2014222220.0%10,091
2013161920.0%12,000
2012374870.1%13,162
2011597280.1%12,339
2010313870.0%12,484
2009223700.0%16,818
200800——
2007425160.1%12,285
20061391,5550.2%11,187
20052462,3010.3%9,354
2004232530.0%11,000
2003303470.0%11,566
2002293300.0%11,380
20014655,2130.6%11,211
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

Every source and license · Attribution

View at source