Mercy Medical Center
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2019 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2004
- Net generation, 2019
- 9 MWh
- Grid
- 14 kV to Long Island Power Authority (NYIS)
- Location
- Nassau County, New York
- Operated by
- Mercy Medical CenterSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 22 years since 2004
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
| Balancing authority code | NYIS |
Retirement
- Capacity retired
- 2.4 MW
- Generators retired
- 7
- Capacity still in service
- 3.6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 2 | Petroleum Liquids | 0.4 MW | Retired | December 2015 |
| 3 | Petroleum Liquids | 0.4 MW | Retired | December 2018 |
| 7 | Petroleum Liquids | 0.3 MW | Retired | July 2020 |
| 1 | Petroleum Liquids | 0.1 MW | Retired | September 2020 |
| 4 | Petroleum Liquids | 0.7 MW | Retired | October 2020 |
| 6 | Petroleum Liquids | 0.2 MW | Retired | October 2020 |
| 5 | Petroleum Liquids | 0.3 MW | Retired | December 2020 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- Long Island Power Authority
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 5 scheduled to retire, 0.3 MW · EIA-860M
- Stated Units 4, 6 scheduled to retire, 0.9 MW · EIA-860M
- Stated Unit 1 scheduled to retire, 0.1 MW · EIA-860M
- Stated Unit 7 scheduled to retire, 0.3 MW · EIA-860M
- Stated Unit 3 scheduled to retire, 0.4 MW · EIA-860M
- Stated Unit 2 scheduled to retire, 0.4 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Plant No 1 Freeport Under construction | Biomass | 3.0 mi | 3 |
| Hecate Grid Intrepid Postponed | Storage | 4.9 mi | 300 |
| Water Willow A Clean Energy LLC Under construction | Storage | 7.9 mi | 3.9 |
| Water Willow B Clean Energy LLC Under construction | Storage | 7.9 mi | 3.9 |
| Kennedy International Airport Cogen Postponed | Gas, combustion turbine | 8.3 mi | 50 |
| Coral Honeysuckle Clean Energy LLC Under construction | Storage | 9.9 mi | 3.7 |
| Linden Clean Energy, LLC Under construction | Storage | 10.0 mi | 3.7 |
| Farmingdale Fuel Cell Postponed | Gas, other | 12.0 mi | 1.4 |
| Roseate Tern Clean Energy LLC Under construction | Storage | 13.5 mi | 3.3 |
| Blue Aster B Clean Energy LLC Under construction | Storage | 14.2 mi | 4.9 |
| Blue Aster Clean Energy LLC Under construction | Storage | 14.2 mi | 4.9 |
| Blue Aster C Clean Energy LLC Under construction | Storage | 14.2 mi | 4.9 |
| KCE NY 30, LLC Announced | Storage | 14.6 mi | 50 |
| Clermont Postponed | Storage | 14.6 mi | 100 |
| Piping Plover Clean Energy, LLC Under construction | Storage | 14.9 mi | 2.3 |
| Warbler Clean Energy LLC Under construction | Storage | 14.9 mi | 2.3 |
Sources EIA-860M